Availability: | |
---|---|
Quantity: | |
Outer Diameter | 13.7-457.2mm |
Wall Thickness | 2.11--23.83mm |
NPS | 1/4"-18" |
Schedule | 10/10S,40/40S,80/80S |
Material Grade | S32750,2507 |
Standard | ASTM A790 |
Application | Used in Fluid and Gas Transport, Structure and Machining,etc |
Certificates | ISO9001:2015, PED |
Process Method | Cold Drawn/ Cold Rolled |
Surface Finish | Pickling annealed |
Package | Woven bags |
Delivery Time | 2 weeks |
Price Item | FOB, CIF or as negotiation |
Payment | T/T(30% in advance, 70% against the BL Copy) or as negotiation |
Quality Requirement | 100% inspection for every pipes, including but not limited to dimensional inspection, chemical components, mechanical property and ET performed. |
Main Market | Europe, Middle East, Southeast Asia, South America, etc |
Chemical Composition:
C | Si | Mn | P | S | Cr | Ni | Mo | N | Cu | |
2507 | 0.03 | 0.08 | 1.2 | 0.035 | 0.02 | 24.0-26.0 | 6.0-8.0 | 3.0-5.0 | 0.24-0.32 | 0.5 |
Industry & Advantage | Application | a) Petroleum |
b) Chemical industry | ||
c) Instrument | ||
d) Industrial transportation | ||
e) Mechanical structure industry | ||
f) Need high corrosion ability pipe's industry, such as offshore industry etc | ||
Advantages | a) Superior surface finish | |
b) Better mechanical property | ||
c) More precise dimension | ||
d) Perfect inspection method and inspection equipment |
Terms & Conditions :
1 . Price Term : FOB , CFR , CIF or as negotiation
2 . Payment : T / T , L / C or as negotiation
3 . Delivery time : 2 weeks after received your deposit ( Normally according to the order quantity )
4 . Package : woven bag or as per customer’s requirement
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
Outer Diameter | 13.7-457.2mm |
Wall Thickness | 2.11--23.83mm |
NPS | 1/4"-18" |
Schedule | 10/10S,40/40S,80/80S |
Material Grade | S32750,2507 |
Standard | ASTM A790 |
Application | Used in Fluid and Gas Transport, Structure and Machining,etc |
Certificates | ISO9001:2015, PED |
Process Method | Cold Drawn/ Cold Rolled |
Surface Finish | Pickling annealed |
Package | Woven bags |
Delivery Time | 2 weeks |
Price Item | FOB, CIF or as negotiation |
Payment | T/T(30% in advance, 70% against the BL Copy) or as negotiation |
Quality Requirement | 100% inspection for every pipes, including but not limited to dimensional inspection, chemical components, mechanical property and ET performed. |
Main Market | Europe, Middle East, Southeast Asia, South America, etc |
Chemical Composition:
C | Si | Mn | P | S | Cr | Ni | Mo | N | Cu | |
2507 | 0.03 | 0.08 | 1.2 | 0.035 | 0.02 | 24.0-26.0 | 6.0-8.0 | 3.0-5.0 | 0.24-0.32 | 0.5 |
Industry & Advantage | Application | a) Petroleum |
b) Chemical industry | ||
c) Instrument | ||
d) Industrial transportation | ||
e) Mechanical structure industry | ||
f) Need high corrosion ability pipe's industry, such as offshore industry etc | ||
Advantages | a) Superior surface finish | |
b) Better mechanical property | ||
c) More precise dimension | ||
d) Perfect inspection method and inspection equipment |
Terms & Conditions :
1 . Price Term : FOB , CFR , CIF or as negotiation
2 . Payment : T / T , L / C or as negotiation
3 . Delivery time : 2 weeks after received your deposit ( Normally according to the order quantity )
4 . Package : woven bag or as per customer’s requirement
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.