info@smlspipestock.com / info@smlscostock.com 
You are here: Home » Seamless Stainless Steel Pipe » Seamless Steel Pipe » Austenitic Steel Seamless Pipe » UNS S30400 Cold Rolled Seamless Stainless Steel Pipe For Engineering

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

UNS S30400 Cold Rolled Seamless Stainless Steel Pipe For Engineering

Availability:
Quantity:
  • SMLSCO-8

  • SMLSCO

  • DN8-DN450

  • woven bag or as per customer’s

  • FOB/CFR/CIF,etc

  • T/T, L/C or as negotiation

UNS S30400 Seamless Pipe Specification:

Outer Diameter

13.7-457.2mm

Wall Thickness

2.11--23.83mm

NPS

1/4"-18"

Schedule

10/10S,40/40S,80/80S

Material Grade

TP304L,TP316L,TP317L,TP321/321H,TP310S,TP316Ti ,TP347H

Standard

ASTM A312

Application

Used in Fluid and Gas Transport, Structure and Machining,etc

Certificates

ISO9001:2015, PED

Process Method

Cold Drawn/ Cold Rolled

Surface Finish

Pickling annealed

Package

Woven bags for cabinets

Delivery Time

2 weeks


UNS S30400 Seamless Pipe Process:

process


UNS S30400 Seamless Pipe Inspection:

NTD(Ultrasonic test, Eddy Current test)

Mechanical Test(Tension Test, Flaring Test, Flattening Test, Hardness Test, Hydraulic test)

Metal Test(Metallographic Analysis, Impact Test-High/low temperature)

Chemical Analysis(Photoelectric Emission Spectroscopic)


Terms & Conditions :

1 . Price Term : FOB , CFR , CIF or as negotiation

2 . Payment : T / T , L / C or as negotiation

3 . Delivery time : 2 weeks after received your deposit ( Normally according to the order quantity )

4 . Package : woven bag or as per customer’s requirement


Here's a warm tip: 

Chinese New Year is almost 3 months away.

Taking into account the following factors,we recommend that now maybe a better time to prepare your stock.


1. Seamless pipe production takes a long time, about 2-3 months.

But of course if you have an urgent need for replenishment, you can contact us and we have a large quantity of normal sizes stock for immediate delivery.


2. Most of the seamless pipe production areas in China have implemented a policy of power and production restrictions, which will have a huge impact on China's seamless pipe production capacity as well as delivery schedules, so prepare your inventory earlier this year than in previous years will be better.


3. Shipping capacity is still very tight and prices remain high as the global epidemic remains severe. So in order to avoid a surge in shipments at the end of the Chinese New Year, where containers are hard to find, we advise our customers to prepare their stocks for the end of the year in advance.


Hope that the above information and advice will bring you a little value and help you to make a more informed purchasing decision.

pipe10005

Previous: 
Next: 

Product Category

Contact us

Bigger, Faster, Cheaper are what we pursue
SMLSCO - your stainless steel pipeline system products warehouse in China!
 

SUBSCRIBE

CONTACT

Phone: +86-157-5733-6381  / +86-573-8283-706
Email: info@smlspipestock.com / info@smlscostock.com
Web: www.smlspipestock.com / www.smlscostock.com
Sales Office Add: No. 501, Changsheng South Road, Jiaxing, Zhejiang, China Seamless Pipe/Tube Branch Add:No.3 Weier Road, Binhai Street, Longwan District, Wenzhou City, Zhejiang Province, China 
Flange/Fitting Branch Add: No. 877, Lingzhan Road, Kunpeng Street, Marine Economic Development Demonstration Zone, Wenzhou City, Zhejiang Province

Products Categories

Quick Links

Copyright © 2021 Zhejiang seamless pipe co.,ltd   Supported by leadong.com    Sitemap