SMLSCO-148
SMLSCO
DN8-DN450
woven bag or as per customer’s
FOB/CFR/CIF,etc
T/T, L/C or as negotiation
Size | OD:13.7-457.2mm |
WT:2.11--23.83mm | |
Length:6M,12M,5-7Mrandom length,According to customer requirements | |
Process | Cold drawn,cold rolled |
Package | Woven bags |
End | PE/BE |
316/L Chemical Composition (wt.%) | ||
Element | 316 | 316L |
C | ≤ 0.08 | ≤ 0.03 |
Si | ≤ 1.00 | ≤ 1.00 |
Mn | ≤ 2.00 | ≤ 2.00 |
P | ≤ 0.045 | ≤ 0.045 |
S | ≤ 0.030 | ≤ 0.030 |
Cr | 16.0 - 18.0 | 16.0 - 18.0 |
Ni | 10.0 - 14.0 | 10.0 - 14.0 |
Mo | 2.0 - 3.0 | 2.0 - 3.0 |
316/L Physical Property:
a) General service industries (petroleum, food, chemical, paper, fertilizer, fabric, aviation and nuclear)
b) Fluid, gas and oil transport
c) Pressure and heat transmission
d) Construction and ornament
e) Boiler heat exchangers
f) Decorative usage (road lamp facilities, bridge handrail, expressway railing, bus stop, airport and
gymnasium)
g) auto parts, medical equipment, building materials, food industry.etc
1 . Price Term : FOB , CFR , CIF or as negotiation
2 . Payment : T / T , L / C or as negotiation
3 . Delivery time : 2 weeks after received your deposit ( Normally according to the order quantity )
4 . Package : woven bag or as per customer’s requirement
Size | OD:13.7-457.2mm |
WT:2.11--23.83mm | |
Length:6M,12M,5-7Mrandom length,According to customer requirements | |
Process | Cold drawn,cold rolled |
Package | Woven bags |
End | PE/BE |
316/L Chemical Composition (wt.%) | ||
Element | 316 | 316L |
C | ≤ 0.08 | ≤ 0.03 |
Si | ≤ 1.00 | ≤ 1.00 |
Mn | ≤ 2.00 | ≤ 2.00 |
P | ≤ 0.045 | ≤ 0.045 |
S | ≤ 0.030 | ≤ 0.030 |
Cr | 16.0 - 18.0 | 16.0 - 18.0 |
Ni | 10.0 - 14.0 | 10.0 - 14.0 |
Mo | 2.0 - 3.0 | 2.0 - 3.0 |
316/L Physical Property:
a) General service industries (petroleum, food, chemical, paper, fertilizer, fabric, aviation and nuclear)
b) Fluid, gas and oil transport
c) Pressure and heat transmission
d) Construction and ornament
e) Boiler heat exchangers
f) Decorative usage (road lamp facilities, bridge handrail, expressway railing, bus stop, airport and
gymnasium)
g) auto parts, medical equipment, building materials, food industry.etc
1 . Price Term : FOB , CFR , CIF or as negotiation
2 . Payment : T / T , L / C or as negotiation
3 . Delivery time : 2 weeks after received your deposit ( Normally according to the order quantity )
4 . Package : woven bag or as per customer’s requirement