Availability: | |
---|---|
Quantity: | |
SMLSCO-217
SMLSCO
DN8-DN450
woven bag or as per customer’s
FOB/CFR/CIF,etc
T/T, L/C or as negotiation
YS(Mpa) | TS(Mpa) | EL | HB | |
S31803 | ≥450 | ≥620 | ≥25 | ≤290 |
2205 | ≥450 | ≥655 | ≥25 | ≤290 |
Item | Description | |
Basic Information | Material Grade | S31803 ,2205 etc |
Outer Diameter | 13.7-457.2mm | |
Wall Thickness | 2.11--23.83mm | |
Length | 6M,12M,5-7Mrandom length,According to customer requirements | |
Standard | ASTM A790 ect . | |
Process Method | Cold Drawn or Cold Rolled |
Chemical composition inspection
mechanical property inspection
dimensional inspection
appearance inspection
straightness inspection
non-destructive testing
Packaging Details:Woven bags or according to customer requirements
Port:SHANGHAI/NINGBO
Bigger:2,000 tons stainless steelseamless pipes20,000 square meters ofindoor warehouse
Faster:Ships in 2 weeks
Cheaper:Same quality,better priceSame price,better quality
-Our Principle: Be nice to our customers.
-Win-win Business Model: When we think it is a good time to stock, we will give customers advice.
-When we know that a significant price drop is imminent we will discourage you from making bulk purchases.
-We know only when customers exist and develop for a long time can our development be possible.
Quality Control
A: We are a factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free but do not pay the freight cost.
YS(Mpa) | TS(Mpa) | EL | HB | |
S31803 | ≥450 | ≥620 | ≥25 | ≤290 |
2205 | ≥450 | ≥655 | ≥25 | ≤290 |
Item | Description | |
Basic Information | Material Grade | S31803 ,2205 etc |
Outer Diameter | 13.7-457.2mm | |
Wall Thickness | 2.11--23.83mm | |
Length | 6M,12M,5-7Mrandom length,According to customer requirements | |
Standard | ASTM A790 ect . | |
Process Method | Cold Drawn or Cold Rolled |
Chemical composition inspection
mechanical property inspection
dimensional inspection
appearance inspection
straightness inspection
non-destructive testing
Packaging Details:Woven bags or according to customer requirements
Port:SHANGHAI/NINGBO
Bigger:2,000 tons stainless steelseamless pipes20,000 square meters ofindoor warehouse
Faster:Ships in 2 weeks
Cheaper:Same quality,better priceSame price,better quality
-Our Principle: Be nice to our customers.
-Win-win Business Model: When we think it is a good time to stock, we will give customers advice.
-When we know that a significant price drop is imminent we will discourage you from making bulk purchases.
-We know only when customers exist and develop for a long time can our development be possible.
Quality Control
A: We are a factory.
A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free but do not pay the freight cost.