Availability: | |
---|---|
Quantity: | |
Outer Diameter | 13.7-457.2mm |
Wall Thickness | 2.11--23.83mm |
NPS | 1/4"-18" |
Schedule | 10/10S,40/40S,80/80S |
Material Grade | S32750,2507,S32760 |
Standard | ASTM A790 |
a) Advanced technology of cold draw machine
b) Advanced annealing machine
c) Better mechanical property
d) More precise dimension
e) Perfect inspection method and inspection equipment etc
Test | NTD(Ultrasonic test, Eddy Current test); |
Mechanical Test(Tension Test, Flaring Test, Flattening Test, Hardness Test, Hydraulic test); | |
Metal Test(Metallographic Analysis, Impact Test-High/low temperature); | |
Chemical Analysis(Photoelectric Emission Spectroscopic) |
Packaging Details:Woven bags or according to customer requirements
Port:SHANGHAI/NINGBO
we have found that many customers now are facing two major problems—Time and Money!
1. Time
Seamless pipes long delivery time caused financial pressure; customer complain; damage to the company's reputation.
2. Money
Too many parties involved during the procurement process. More people involved, the higher the cost of procurement will be.
Over the 15 years, we have accumulated certain capital and customer information, and we understand that now you need us to provide more competitive seamless pipes in the current fierce market competition.
2000 tons ready stock, if you have any need,feel free to let us know!
Outer Diameter | 13.7-457.2mm |
Wall Thickness | 2.11--23.83mm |
NPS | 1/4"-18" |
Schedule | 10/10S,40/40S,80/80S |
Material Grade | S32750,2507,S32760 |
Standard | ASTM A790 |
a) Advanced technology of cold draw machine
b) Advanced annealing machine
c) Better mechanical property
d) More precise dimension
e) Perfect inspection method and inspection equipment etc
Test | NTD(Ultrasonic test, Eddy Current test); |
Mechanical Test(Tension Test, Flaring Test, Flattening Test, Hardness Test, Hydraulic test); | |
Metal Test(Metallographic Analysis, Impact Test-High/low temperature); | |
Chemical Analysis(Photoelectric Emission Spectroscopic) |
Packaging Details:Woven bags or according to customer requirements
Port:SHANGHAI/NINGBO
we have found that many customers now are facing two major problems—Time and Money!
1. Time
Seamless pipes long delivery time caused financial pressure; customer complain; damage to the company's reputation.
2. Money
Too many parties involved during the procurement process. More people involved, the higher the cost of procurement will be.
Over the 15 years, we have accumulated certain capital and customer information, and we understand that now you need us to provide more competitive seamless pipes in the current fierce market competition.
2000 tons ready stock, if you have any need,feel free to let us know!