info@smlspipestock.com / info@smlscostock.com 
You are here: Home » Seamless Stainless Steel Pipe » Seamless Steel Pipe » Duplex Steel Seamless Pipe » Large Diameter UNS S31803 Seamless Steel Pipe for Water Project

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
sharethis sharing button

Large Diameter UNS S31803 Seamless Steel Pipe for Water Project

Availability:
Quantity:

Seamless Pipe Basic Information:

 

Item

Description

Basic Information

Material Grade

 S31803 etc

Outer Diameter

13.7-457.2mm

Wall Thickness

2.11--23.83mm

Length

6M,12M,5-7Mrandom length,According to customer requirements

Standard

ASTM A790 ect .

Process Method

Cold Drawn or Cold Rolled


Process Of Seamless Pipe:

process

SMLS Pipe 100% Test:

Test Requirement

Eddy Current Test , Hydrostatic Test , UT , Penetrant Test , Air underwater pressure Test ,

PMI Test , Spectro Test , Intergranular Corrosion Test , Sharpy Impact Test , Hardness Test ,

Tension Test ( Elongation , Yield Strength , Tensile Strength ) , Flarring Test etc .


Terms & Conditions :

1 . Price Term : FOB , CFR , CIF or as negotiation

2 . Payment : T / T , L / C or as negotiation

3 . Delivery time : 2 weeks after received your deposit ( Normally according to the order quantity )

4 . Package : woven bag or as per customer’s requirement

 

Here's a warm tip: 

Chinese New Year is almost 3 months away.

Taking into account the following factors,we recommend that now maybe a better time to prepare your stock.

1. Seamless pipe production takes a long time, about 2-3 months.


But of course if you have an urgent need for replenishment, you can contact us and we have a large quantity of normal sizes stock for immediate delivery.


2. Most of the seamless pipe production areas in China have implemented a policy of power and production restrictions, which will have a huge impact on China's seamless pipe production capacity as well as delivery schedules, so prepare your inventory earlier this year than in previous years will be better.


3. Shipping capacity is still very tight and prices remain high as the global epidemic remains severe. So in order to avoid a surge in shipments at the end of the Chinese New Year, where containers are hard to find, we advise our customers to prepare their stocks for the end of the year in advance.


Hope that the above information and advice will bring you a little value and help you to make a more informed purchasing decision.


pipe10012

Previous: 
Next: 

Product Category

Contact us

Related Products


Bigger, Faster, Cheaper are what we pursue
SMLSCO - your stainless steel pipeline system products warehouse in China!
 

SUBSCRIBE

CONTACT

Phone: +86-157-5733-6381  / +86-573-8283-706
Email: info@smlspipestock.com / info@smlscostock.com
Web: www.smlspipestock.com / www.smlscostock.com
Sales Office Add: No. 501, Changsheng South Road, Jiaxing, Zhejiang, China Seamless Pipe/Tube Branch Add:No.3 Weier Road, Binhai Street, Longwan District, Wenzhou City, Zhejiang Province, China 
Flange/Fitting Branch Add: No. 877, Lingzhan Road, Kunpeng Street, Marine Economic Development Demonstration Zone, Wenzhou City, Zhejiang Province

Products Categories

Quick Links

Copyright © 2021 Zhejiang seamless pipe co.,ltd   Supported by leadong.com    Sitemap