SMLSCO-175
SMLSCO
DN8-DN450
woven bag or as per customer’s
FOB/CFR/CIF,etc
T/T, L/C or as negotiation
Outer Diameter | 13.7-457.2mm |
Wall Thickness | 2.11--23.83mm |
NPS | 1/4"-18" |
Schedule | 10/10S,40/40S,80/80S |
Material Grade | TP304L,TP316L,TP317L,TP321/321H,TP310S,TP316Ti ,TP347H |
Standard | ASTM A312 |
Application | Used in Fluid and Gas Transport, Structure and Machining,etc |
Certificates | ISO9001:2015, PED |
Process Method | Cold Drawn/ Cold Rolled |
Surface Finish | Pickling annealed |
Package | Woven bags for cabinets |
Delivery Time | 2 weeks |
304/L Chemical Composition (wt.%) | ||
Element | 304 | 304L |
C | ≤ 0.08 | ≤ 0.03 |
Si | ≤ 0.75 | ≤ 0.75 |
Mn | ≤ 2.00 | ≤ 2.00 |
P | ≤ 0.045 | ≤ 0.045 |
S | ≤ 0.030 | ≤ 0.030 |
Cr | 18.0 - 20.0 | 18.0 - 20.0 |
Ni | 8.0 - 10.5 | 8.0 - 12.0 |
NTD(Ultrasonic test, Eddy Current test)
Mechanical Test(Tension Test, Flaring Test, Flattening Test, Hardness Test, Hydraulic test)
Metal Test(Metallographic Analysis, Impact Test-High/low temperature)
Chemical Analysis(Photoelectric Emission Spectroscopic)
we have found that many customers now are facing two major problems—Time and Money!
1. Time
Seamless pipes long delivery time caused financial pressure; customer complain; damage to the company's reputation.
2. Money
Too many parties involved during the procurement process. More people involved, the higher the cost of procurement will be.
Over the 15 years, we have accumulated certain capital and customer information, and we understand that now you need us to provide more competitive seamless pipes in the current fierce market competition.
2000 tons ready stock, if you have any need,feel free to let us know!
Outer Diameter | 13.7-457.2mm |
Wall Thickness | 2.11--23.83mm |
NPS | 1/4"-18" |
Schedule | 10/10S,40/40S,80/80S |
Material Grade | TP304L,TP316L,TP317L,TP321/321H,TP310S,TP316Ti ,TP347H |
Standard | ASTM A312 |
Application | Used in Fluid and Gas Transport, Structure and Machining,etc |
Certificates | ISO9001:2015, PED |
Process Method | Cold Drawn/ Cold Rolled |
Surface Finish | Pickling annealed |
Package | Woven bags for cabinets |
Delivery Time | 2 weeks |
304/L Chemical Composition (wt.%) | ||
Element | 304 | 304L |
C | ≤ 0.08 | ≤ 0.03 |
Si | ≤ 0.75 | ≤ 0.75 |
Mn | ≤ 2.00 | ≤ 2.00 |
P | ≤ 0.045 | ≤ 0.045 |
S | ≤ 0.030 | ≤ 0.030 |
Cr | 18.0 - 20.0 | 18.0 - 20.0 |
Ni | 8.0 - 10.5 | 8.0 - 12.0 |
NTD(Ultrasonic test, Eddy Current test)
Mechanical Test(Tension Test, Flaring Test, Flattening Test, Hardness Test, Hydraulic test)
Metal Test(Metallographic Analysis, Impact Test-High/low temperature)
Chemical Analysis(Photoelectric Emission Spectroscopic)
we have found that many customers now are facing two major problems—Time and Money!
1. Time
Seamless pipes long delivery time caused financial pressure; customer complain; damage to the company's reputation.
2. Money
Too many parties involved during the procurement process. More people involved, the higher the cost of procurement will be.
Over the 15 years, we have accumulated certain capital and customer information, and we understand that now you need us to provide more competitive seamless pipes in the current fierce market competition.
2000 tons ready stock, if you have any need,feel free to let us know!